• Training Spray Paint Booth in China
  • Training Spray Paint Booth in China
  • Training Spray Paint Booth in China
  • Training Spray Paint Booth in China
  • Training Spray Paint Booth in China
  • Training Spray Paint Booth in China

Training Spray Paint Booth in China

Type: Spray Booth
Certification: CE
Substrate: EPS Insulation Panel
Brand: Yokistar
Coating: 0.426mm Color Steel
Airflow Direction: Full Downdraft Airflow Way
Customization:

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5

Basic Info.

Model NO.
Kalux-O
Heating Mode
Diesel
Paint Mist Treatment
Dry-type
Condition
New
Available Size
7000*5000*2650 mm (L*W*H)
Overall Size
7100*6750*3400 mm (L*W*H)
EPS Wall Panels Thickness
50mm
Color Steel Thickness
0.426mm
Lighting
48*36W Ceiling Lights Installed in The Roof
Heating
12 Units Quantum Radiator Heating System
Fans
Two Fans and 46 Stainless Steel Jets
Filtration
Fiberglass Filter&M-Shaped Active Carbon Filter
Main Products
Spray Booth Prep Station, Infrared Curing Lamp

Product Description

The China Volkswagen Training Center has received a new YOKISTAR industrial spray booth, with installation completed in January. This large train spray booth includes a moveable overhead quantum radiator and standard inclusions in a single piece of equipment. As well as being a new tool for car repairs, the installation also showcases the talents and craftsmanship of YOKISTAR employees.

The new industrial spray booth includes nine viewing side windows for student training. It is a large spray booth, creating a spacious, bright and comfortable working environment. Paint can be dried quickly with a moveable overhead quantum radiator, including water-soluble paint that can also be dried in the booth.

Training Spray Paint Booth in China

The specifications of the train spray booth are
1. Total Size: Available size of the paint spray booth is 7000×5000×2650 mm (L×W×H), and the overall size is 7100×6750×3400 mm(L×W×H).

2. Construction: EPS wall panels of 50mm thickness and 0.426mm thick color steel.

3. Lighting: There are a total of forty eight 36W ceiling lights installed in the roof.

4. Heating: The quantum radiator heating system has a total of 12 units - three on the rear panel, five on the left side and four just below ceiling height. 

5. Fans: The unit has two fans and 46 stainless steel jets installed in the ceiling.

6. Filtration: The primary pocket filter and ceiling filter do the first step of air cleaning, with the fiberglass filter and M-shaped active carbon filter providing the final stage of filtration to provide a safe working environment inside. 


Customizing Your Large Industrial Train Spray Booth
The following options are available:
* Dimensions of the booth can be custom built to suit your products and specifications.
* Infra-Red Lamp can be installed as a replacement for the quantum radiators if required.
* Heat Recovery Unit can be installed to improve the energy efficiency of the system.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now